7 October 2026
New shelter or upgraded one? Reading tarp-to-timber changes in imagery

A planning officer looking at this week's pass over a spontaneous settlement sees the same thing every week: more roofs than last time. The question that matters is whether those roofs mean more households or just better ones. A tarp shelter that got replaced with a timber frame and corrugated sheeting looks different in the image, but it isn't a new arrival. A new plastic sheet pitched on bare ground twenty meters from the last row is.
Mixing those two up is an easy way to overstate a caseload, and it happens constantly when someone eyeballs a single frame instead of comparing it against the week before.
Footprint change is the population signal
The reliable marker of a new household is a footprint that didn't exist before: a polygon of shelter area appearing on ground that was bare dirt, scrub, or an access path in the prior pass. New footprint, new structure, count it.
An upgrade shows a different pattern. The footprint is already there in last week's imagery, roughly the same shape and position, but the roof signature has changed. Tarp roofs tend to read as bright, uniform, often bluish or white in RGB, with a flat reflective surface that saturates slightly in strong sun. Once a household frames it in timber and tops it with corrugated metal or thatch, the roof gets darker, more textured, and the edges sharpen where a tarp's edges tend to sag or ripple. Same footprint, different material: that's a shelter condition change, and the household was already on the ground the week before.
The practical rule: footprint area is the proxy for population, material is a proxy for shelter quality or permanence. A planning officer sizing a response cares about the first one. The second one matters for a shelter cluster report, not a headcount.
Where this actually gets confusing
A few situations blur the line and are worth knowing before they cost you a bad estimate.
Extensions are the most common trap. A household adds a lean-to or a second room against an existing structure, so the footprint grows while the original shelter stays occupied by the same family. A naive count flags that growth as a new household, when it's really the same family expanding what they already had. The tell is adjacency: the new area touches or wraps around an existing footprint rather than sitting isolated on previously empty ground.
Demolition-and-rebuild on the same plot is the opposite problem. A household tears down a tarp shelter entirely and rebuilds in timber on the identical footprint. Between weekly passes you might catch a frame with no roof at all, scaffolding, bare posts, before the new roof goes on. On its own that frame can look like an abandoned or collapsed structure. Compared against the following week, the new roof going up confirms it as a rebuild in progress rather than a departure.
And shadow and sun angle do strange things to tarp reflectance. A tarp shelter photographed at a low sun angle can read darker and patchier than the same shelter at midday, enough that it can be mistaken for a material change if the two passes were flown at different times of day. This is less of a problem on a fixed weekly cadence with consistent acquisition windows, but it's the reason a single comparison pair is never as reliable as a run of several weeks showing a consistent trend.
The common thread across all three is that no single image answers the question. What tells new footprint from material change from extension from rebuild is the sequence: this week's frame held up against last week's and the week before that, polygon by polygon, roof signature by roof signature.
A one-off site visit gives a planning team a snapshot of what's there on the day someone walked the site. A weekly change layer shows which footprints are genuinely new versus which existing shelters just got a roof upgrade. Displacement Monitoring builds that layer from VHR imagery on a weekly cadence, delivering a structure count and a change map or CSV that separates new shelter footprints from material and condition changes on structures already standing, so a response gets sized off what changed on the ground rather than off last month's registration numbers.
If your team needs that distinction built into a weekly feed rather than worked out frame by frame, it's worth a look.