2 November 2026
How to estimate arrival rate from a weekly shelter count trend

You've got two weekly counts and a planning meeting in an hour. Last week's imagery showed 3,100 structures across the site. This week it's 3,340. Someone is going to ask how many people arrived, and "about 240 more tents" isn't the answer they need. They need people per week, because that's what feeds the water trucking schedule and the latrine ratio.
Here's the actual math, and where it breaks.
Converting a structure delta into people
The raw move is simple: take the week-over-week tent growth, multiply by your occupancy assumption, and you have an arrival estimate. If your agency uses 4.5 people per shelter (adjust to whatever your sector coordination group has agreed), 240 new structures reads as roughly 1,080 new arrivals that week.
A single week's delta is noisy, though. Someone built a second structure next to their first because the first one flooded. A family consolidated two tents into one. The imagery caught a market day when half the population had temporarily pitched shelters near a distribution point and struck them two days later. A one-week snapshot treats all of that as net growth or net shrinkage, when most of it is churn.
Work off a trend line instead of a single comparison. Pull four to six consecutive weekly counts, plot the structure total, and look at the slope rather than any single jump. Say a site adds 80, then 310, then 60, then 290 new structures over four consecutive weeks. Average those deltas and you're looking at something closer to 185 a week, with imagery timing and local consolidation noise sitting on top of the real number. Average the last three or four deltas and you've got a figure you can defend in a meeting.
Reading the trend line for direction, not just rate
The second thing a structure count trend line gives you is direction, which matters as much as the number itself. A site can hold a flat total structure count while still taking in new arrivals, if departures or consolidations are happening at close to the same pace. That looks like zero growth on the headline number but tells a different planning story than a site where nothing is moving.
Check three things in the trend before you report a single arrival figure:
- Is the footprint of the settlement expanding into new ground, or is density increasing inside the existing boundary? Expansion usually means new arrival pressure. Infill can mean consolidation of existing households rather than growth.
- Are there multiple spontaneous clusters appearing at the edge of the main site rather than inside it? That often shows up before the main count catches it, because early arrivals self-settle on the perimeter before anyone formalizes the plot layout.
- Did the count drop sharply for one week and then jump back up the next? That's usually an imagery or cloud-cover gap, not a mass departure followed by a mass return.
None of this requires fieldwork to catch. It requires having the same AOI counted on the same cadence long enough to see a pattern instead of a point.
What the weekly number is actually good for
An influx rate from imagery is not a census. It won't tell you household size, vulnerability status, or country of origin, and it shouldn't replace registration once registration is possible. What it's good for is the gap before registration catches up, or the weeks between registration rounds when the population on the ground has clearly moved past the last headcount. If your sizing is still running off last month's registration figures, a current structure count trend line is the fastest way to tell whether that figure is still close to true or three weeks stale.
This is the problem Displacement Monitoring is built around: a weekly structure count and change layer pulled from VHR imagery, delivered as a map layer or CSV so you can plug the delta straight into whatever occupancy model your team already uses, without waiting on a ground survey to tell you the site has grown.
If you're sizing a response right now and the last hard number you have is weeks old, a weekly structure count layer is worth checking before the next planning cycle.